Setting up a new company
The order that actually works when you're starting from zero: what has to exist before the next thing can be created, from your first site down to a PM schedule.
LockLedger's data has a real hierarchy underneath it, not just a suggested order. A few things are hard dependencies — you'll hit a wall trying to skip ahead — and getting the sequence right the first time saves you from backtracking.
The order
- 1
1. Site
Nothing else can exist until you have at least one. Right after signup, LockLedger walks the founding Admin straight into adding one — that screen says it outright: equipment, locations, parts, and tickets all live under a site, so none of them can be created until there's one to hold them. Add more sites later from
Sites(Admin-only; even a Manager has no write access here). - 2
2. Locations
A zone within a site — a building, a fill line, a warehouse. Create these next: equipment requires a location the moment you create it, so at least one has to exist first.
- 3
3. Equipment
A machine at a specific site and location. This is the one everything downstream keys off of — tasks and PM schedules both need at least one piece of equipment to attach to;
New Taskon the Tasks screen stays disabled until one exists. - 4
4. Users
Not a hard dependency on the above — invite people, or approve their join requests, whenever it's convenient. The one thing that does depend on Sites existing first: a Manager or Tech has to be assigned to a site to see anything scoped to it, so add your sites before you assign staff to them.
- 5
5. Parts
Belong to a site (required), optionally scoped to specific equipment. Not required before Tasks — a task's required parts can be added any time after the task exists — but it's less back-and-forth to have your parts catalog in place before you start building task templates that need to reference it.
- 6
6. Tasks and PM schedules
The last step: task templates (what work is done, what parts it needs) get linked to one or more machines, and any machine on a PM task carries its own recurring schedule — interval, due date, history. Full walkthrough in Creating tasks and PM schedules.
Site is the only step you truly cannot skip
Everything past it — locations, equipment, users, parts, tasks — can technically be created out of order or filled in gradually. Site is the one genuine hard stop: the onboarding screen won't let the founding Admin finish setup without naming at least one.
Adding a second site later
The same order applies to any additional site you add down the road — a new location, then equipment, then whatever parts and tasks that site needs. Existing users aren't automatically assigned to a new site; go to Users and add the site to whoever needs to work there.
Not using LockLedger yet? Join the pilot
support@getlockledger.com